Configuring your Preventive Maintenance (PM) dispatch options allows you to enable automatic dispatching for PM work orders on a per-property basis. Follow the steps below to enable, update, or disable automatic dispatching.
- Go to Control Panel > Setup > Work Order Routing.
- Click on the Options tab, and select the desired property from the drop-down list.
- In the PM Dispatch Options section:
- To enable automatic dispatching, click the Enable PM Automatic Dispatch checkbox, if it is not currently checked (unchecking this box will disable automatic dispatching for the selected property).
- You can modify the Pre-dispatch Scheduled Work Orders (days) field to select the number of days before the due date that the system should attempt automatic dispatching.
- Click on Save.
|
Last Updated: May 19, 2016
|
|
|
|
|